🎉 Up to 70% Off Selected ItemsShop Sale
Amana PTAC Sub-Base Kit for 230/208V and 15-20 Amp Cords - PTSB320QW
HomeStore

Amana PTAC Sub-Base Kit for 230/208V and 15-20 Amp Cords - PTSB320QW

Amana PTAC Sub-Base Kit for 230/208V and 15-20 Amp Cords - PTSB320QW

The fully skirted Amana PTAC sub-base conceals wiring beneath the unit and provides it with strong support. Receptacles included for plugs and field-wiring access. Hardware and kit included for installation.

  • For use with PTAC units with 208/230V rated voltage and 15-20 amp power cords.
  • Sub-base can be installed before or after wall sleeve installation occurs.
  • Minimum clearance between bottom of wall sleeve and floor is 3.75". Maximum clearance is 5".
  • Minimum clearance between wall sleeve flange and finished adjacent wall is 2.75"
$46.41

Original: $154.70

-70%
Amana PTAC Sub-Base Kit for 230/208V and 15-20 Amp Cords - PTSB320QW—

$154.70

$46.41

Amana PTAC Sub-Base Kit for 230/208V and 15-20 Amp Cords - PTSB320QW

The fully skirted Amana PTAC sub-base conceals wiring beneath the unit and provides it with strong support. Receptacles included for plugs and field-wiring access. Hardware and kit included for installation.

  • For use with PTAC units with 208/230V rated voltage and 15-20 amp power cords.
  • Sub-base can be installed before or after wall sleeve installation occurs.
  • Minimum clearance between bottom of wall sleeve and floor is 3.75". Maximum clearance is 5".
  • Minimum clearance between wall sleeve flange and finished adjacent wall is 2.75"

Product Information

Shipping & Returns

Description

The fully skirted Amana PTAC sub-base conceals wiring beneath the unit and provides it with strong support. Receptacles included for plugs and field-wiring access. Hardware and kit included for installation.

  • For use with PTAC units with 208/230V rated voltage and 15-20 amp power cords.
  • Sub-base can be installed before or after wall sleeve installation occurs.
  • Minimum clearance between bottom of wall sleeve and floor is 3.75". Maximum clearance is 5".
  • Minimum clearance between wall sleeve flange and finished adjacent wall is 2.75"
Amana PTAC Sub-Base Kit for 230/208V and 15-20 Amp Cords - PTSB320QW | The Furnace Out